|
Construction and
Maintenance
-
Hover Police Tower
High Power Storage Building
Range A Wall
Cowboy Targets
Storage Building Range A-B
Clearing the Entrance Road
Gravel on Range "C"
-
|
Six new steel targets for the Cowboy Action Shoot have been
completed. The photos show the construction and provide a comparison
to the existing steel targets. Thanks to Bobby Trammel at Tri-Fab
Steel for donating the steel for the target frames. Thanks to Mark Edwards
for painting all the targets and stands. |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
| Five new targets for the Cowboy Action
Shoot |
|
 |
Top of Page
-
|
The rusty steel wall at Range A received a new coat of paint. |
 |
Top of Page
-
Top of Page
-
Top of Page
-
-
-
|
Storage House Between Range "A" and "B"
|
|

Forming the Slab |

Pouring Concrete |
| We wish to express our thanks to Richard
Zaragoza for volunteering his time and equipment to pour the slab
foundation for the Storage House located between Range "A" and "B." |
|
 |
|
 |
|